Hi,
I have bulk part for Paint. As you can imagine, the quantity of paint depends on the surface area. (For me it can vary between 0.5 to 3 litres). I have the total surface area to be painted as a parameter in assembly. Now I need to connect that to a parameter in the bulk and then multiply by the thickness and add the wastage (in percentage). Our usual method of connection is not working (SURFACE_AREA = TOTAL_SURFACE_AREA:1)
Is it possible to somehow give BOM_REPORT_QUANTITY in a normal part. I need this as the quantity can have decimal places (eg 0.617 litres or 1.221 litres etc...)
Awaiting for some answer.
Regards
Basil